The pieces of the puzzle that form the LaLa are starting to gel
K has finally figured out how to do the pantry doors. And he was able to cut back the cabinet over the fridge that was too tall. As well he cut back the cabinet for the sink that was too wide. All the bathroom cabinets are set. We are now waiting on Pieri to show up and measure for the Carrara slabs for these cabinets.
Before he leaves, I asked K to make sure he does the threshold and the bottom board up in the terrace, which still needs to be sided.
Vic came by today from Twickler’s and said he did use galvanized nails even though Ken had said he didn’t because there was rust. He also found that Bejamin and his crew had not caulked properly up on the roof, which might be where the leak that hasn’t leaked since was coming from – so Peter will get up there to caulk and paint what he calls the “dollhouse” or the dormer that sticks up from the addition.
I told Giovanni I want the baseboards to meet perfectly not just almost like he had laid out in two bathrooms.
Earl was a no show even though he was due in last Friday and at the latest today to start putting the light fixtures in.
Ken leaves for Michigan at the end of this week and doesn’t return until the 8th of January – want to make a bet nothing happens while he is gone? SIGH.
BUT – it is getting so close I can almost feel the hot bubbly water as I sink down into my tub. End of February? Perhaps. Maybe this time, that is a date to mark in my calendar. Mardi Gras is the 20th of Feburary – maybe in by then?